CAUSE: | You specified project-wide timing requirements or made individual timing assignments, but the Timing Analyzer found that the design did not achieve the specified requirement along the specified number of paths. |
ACTION: | View the timing analysis results in the Report window and list and locate the timing paths to identify and correct the paths that do not meet the requirements. |